Request a Template

Start directly with your use case.

What is a Budget Manager template?

A personalised template lets you start directly with your specific use case. Each template is tailored to a typical scenario — categories, partner structures, and budget frameworks are already preconfigured. Import via the Excel import feature on the Settings page with a single click.

Template examples

Ready-configured for typical use cases — import and start immediately.

Cambridge Alliance — Joint Investment & Financial Plan
Investors & Joint Ventures

Shared Machinery Centre — Cambridge Alliance

Six industrial companies jointly invest in a machinery centre with a total volume of £54 million. Budget Manager Pro provides the neutral platform: each company is entered with its capital share, and every expense is automatically allocated proportionally. Cost categories for construction, machinery, building services, IT, and project management are fully configured. Ideal for joint ventures, investor pools, and shared infrastructure projects of any scale.

Request template
Class Trip Rügen — Budget Manager import view
Schools & Education

Class Trips & School Events

Class trips mean collecting parent contributions, tracking costs, and settling accounts at the end. Each class is set up as its own project with pupils as partners with equal shares. Predefined categories for accommodation, travel, catering, and entrance fees let you start immediately. Payment status per family is visible at a glance; teacher allowances are recorded separately. Instead of patchy spreadsheets — a complete, transparent overview.

Request template
Wohnpark Sonnenhang — Property management Budget Manager
Real Estate & Property Management

Residential Park — Multiple Buildings & Units

Allocating service charges across multiple residential units and producing correct annual statements is one of the most error-prone tasks in property management. Units are registered as partners; cost categories based on service charge regulations are already in place. Advance service charge payments are recorded per unit and reconciled against actual expenditure. Property managers and HOA administrators save hours on the annual settlement.

Request template
Villa Grunewald — Construction project Budget Manager
Construction Projects

Villa New Build Berlin-Grunewald — Budget & Cost Control

A villa build spanning three years, seven trades, and a budget of €1.65 million: Budget Manager Pro delivers complete cost control without a financial background. All contractors are listed as partners with their contract volumes. Categories for architecture, structural works, MEP, interior fit-out, outdoor areas, and contingency are ready. Invoices can be checked directly against phase budgets for 2026–2028.

Request template
Church congregation — Work areas & budgets
Churches & Communities

Congregation Budget — Work Areas & Groups

A congregation runs many areas of work simultaneously — youth ministry, choir, buildings, and senior outreach. Each area receives its own annual budget; the church council always has the full picture. Church-specific cost categories such as services, retreats, speaker fees, and collections are predefined. Especially valuable for annual budget planning and mid-year variance analysis across all groups.

Request template
Fleet Management — Vehicle cost controlling
Fleet Management

Vehicle Cost Controlling — Every Car in View

Fleet managers face the same challenge: costs arise everywhere — maintenance, fuel, repairs, inspections — but a consolidated view per vehicle is missing. Budget Manager Pro turns each vehicle into a partner with its own annual budget and cost profile. All expenses are categorized and assigned to the vehicle; target-vs-actual comparisons per vehicle are available at any time. General fleet costs such as parking permits are recorded separately as org. expenses. Whether 3 or 30 vehicles — finally an answer to "Is this vehicle still worth running?"

Request template
Base Template
25
incl. VAT
For Budget Manager Base
Preconfigured categories
Typical partner structures
Import via Excel file
Request Base template

Request a template